MACAU, CHINA

MACAU LRT

  • MARKETS :
  • Mass Rapid Transit
  • SERVICES :
  • Transportation & Civil Engineering Project & Construction Management
  • SCOPE OF WORK :
  • Viaducts and Station Design Integration for RS&S Interface Plan for Alternative Alignment Tender Documents Preparation Project Management Drainage Landscaping

Design and project management for the new Macau LRT

Phase 1 of the Macau LRT will run from the border gate in the North of Macau near the town of Zhuhai (Mainland China) to the Macau international airport on Taipa Island. Phase 1 length is approximately 21 km, with 21 stations. This line will run mainly on an elevated viaduct with only a small section underground. The project was split into three contracts, C210, C220 and C230. Contract C220 is located from LRT station No 5, close to the Fisherman Wharf entrance, to LRT station No 9 at Nan Wan Lake (station not included). Viaducts and elevated stations are used for the entire route on the C220 segment. According to the reference project, the total length of the C220 segment is about 2.36 km and includes stations No 5, 7 and 8. The viaduct is a prestressed concrete box girder.

 

Scope of work

  • Viaducts and Station Design from Station No 5 to Station No 9 (not included)
  • Harmonization and Integration for RS&S Interface
  • Plan for Alternative Alignment
  • Responsibility for Tender Documents Preparation
  • Responsibility for Project Management, Quality Control, Civil Works, Traffic Diversion, Drainage, Landscaping, etc.
RELATED INSIGHTS